# E116 Failures and Negative Results

1. **H2 frequency prior** did not improve sealed accuracy; rejected.
2. **H3 active support selection** could not be tested; the protocol fixes support; BLOCKED.
3. **Redundant collective voting** adds no quality over one correct agent; negative result preserved.
4. **LLM fine-tuning** was not run; no GPU/API credit; BLOCKED.
5. **24-hour continuous mission** was not run; 1 h passed, 6 h was interrupted; BLOCKED.
6. **E115 is interim**: its primary model-backed result does not exist; G1 is PARTIAL.
7. **No external reviewer**; G19 is PARTIAL.
8. **No independent administration**; G20 is PARTIAL.
