# E265 — Limitations

- Constructed DNF; 16 dev + 24 sealed; 3-literal/3-term sealed.
- Beam improves the mean but not the exact-solve rate; H2 not significant, H3 failed.
- D1 disclosed: freeze replaced before any sealed evaluation.
- External reviewer NOT OBTAINED.
- Same team; no third-party audit.
