# E285 — Next plan

1. Remove a panel: one panel plus an outside audit, then compare cost and recovery.
2. Sequential audit instead of a fixed 40-row block.
3. Test a real outside verifier, not an honest-by-construction oracle.
4. Recruit a named external reviewer; keep the gate BLOCKED.
