# E331-L — next plan

**AGI: NOT ESTABLISHED · RSI: EXPERIMENTAL**

1. **Per-action leases on top of per-use leases.** Bind the lease to the specific action
   and its parameters, not only to the rule.
2. **Adaptive lease size.** Spend more rows when the observed drift hazard is high and
   fewer when it is low; measure the frontier against a fixed lease at equal labels.
3. **Repeated drift and drift during recovery.** Two changes in one mission; does the
   suffix restart recover again, and does the lease's false-negative window compound?
4. **A fallible lease.** A lease answered by a Byzantine oracle panel (E281/E296): the
   lease itself needs a quorum.
5. **Real workload.** Replace the 60 synthetic uses with a recorded task sequence at the
   same label budget.
6. **External review.** Still the blocker for RSI promotion beyond EXPERIMENTAL.
