# E333 — Next plan

1. **Real costs.** Replace row counts with measured microseconds, money per row and rate
   limits; test whether the cost constraint binds then.
2. **Realised-cost risk.** Price the variance of a randomised schedule (a cap that holds
   with probability 1 − δ, not only in expectation).
3. **Multi-row attackers.** Extend the LP to two or more lies; the denial set is no longer
   a single row and the dual changes.
4. **Cost-aware certificate design.** Choose certificates that are both cheap to audit and
   asymmetric in coverage.
5. **Deployment.** Make the cost-constrained re-solve the default and log the audited row
   budget per claim.
6. **Recruit the external reviewer.**
