# E362-B Next Plan

**AGI: NOT ESTABLISHED · RSI: EXPERIMENTAL**

The batching coordinator is study-side. The next engineering step is to move it **inside** the issuer
as a synchronous batch barrier: a lift joins a pending batch and is accepted only when that batch's
root is notarized, preserving E357-A's anchor-before-accept guarantee while amortising the anchor.

Open after that: a second-host writer (the ledger is still one host), a customer-held key, and an
external reviewer. **External reviewer: NOT OBTAINED.**
