# E364 — The adversary knows the sweep (schedule timing law)

**Verdict: SCHEDULE_TIMING_LAW_SUPPORTED** · AGI: NOT ESTABLISHED · RSI: EXPERIMENTAL

E358's rotation guarantees detection within the cycle L for a drift that is **already present**.
E364 asks what happens when the adversary chooses **when** to inject it.

| schedule (same cost) | worst case, timing adversary | pre-committed drift |
|---|---|---|
| public fixed order | **L = 8** | L = 8 |
| secret fixed order | **L = 8** | **4.40** (uniform, 0.55x) |
| per-cycle fresh permutation | **2L-1 = 15** (bound and realised) | 4.40 |
| per-cycle rotated phase | **2L-1 bound**, realised mean 12.00 | 4.40 |
| i.i.d. S rows / round | **no bound** (realised > 2L in 24/24) | 7.79, P(>2L) ≈ 11% |
| full 256-row sweep | 1 round | 1 round |

**The law.** A time-invariant order bounds a timing adversary at exactly **L**. Re-randomising row
positions every cycle **doubles** that bound to **2L-1** at the same cost. A memoryless schedule has no
bound. Secrecy does not change the timing bound — one observed cycle reveals a fixed order — it only
halves the expected latency of a drift committed before the schedule is known, which is why a
**secret fixed** cycle dominates (same bound as public, better pre-committed mean).

Development-only selection (no sealed data) picked the secret fixed order; the sealed set confirms it
attains the minimum bound and a pre-placed mean of 0.55x the public order.

**Near-miss disclosed.** The v1 frozen H2 compared the schedule-family bound to a realised 3-cycle
sample: primary passed 12/12 but the replication salt's rotated arm realised 2L-3, so v1 returned
NOT_SUPPORTED. v2 was frozen before its own run with fresh salts and tests the bound; the v1 report is
preserved unchanged in this bundle.

24 sealed instances · 8 development instances · 0 model calls · $0 API · 0 weights changed. Engine
source withheld; the standalone verifier recomputes every latency table, bound, hypothesis and the verdict.
