# E368-B — The Synchronous Batch Anchor

**AGI: NOT ESTABLISHED · RSI: EXPERIMENTAL**

**Verdict: `SYNCHRONOUS_BATCH_ANCHOR_SUPPORTED`.**

E357-A anchors every lift with one live consensus round. E362-B batched a finished ledger after the
fact. E368-B moves the batch **inside the issuer**: a lift computes a statement commitment, joins a
batch, and blocks until the batch Merkle root is notarized; only then is the row committed, with its
inclusion proof. An unreachable anchor refuses every lift in the batch and writes nothing.

| measure | value |
|---|---|
| 8 lifts, batch 4 | **8 accepted, 2 live anchors** (2 vs 8, **4× fewer**) |
| inclusion proofs | **11/11** recompute to their anchored root |
| anchor receipts | **13/13** verify offline (**5** distinct commitments) |
| synchronous order | every accepted lift has `anchor_finished_at ≤ accepted_at` |
| partial batch (3 of 8) | **1 anchor**, 3 accepted, 3 proofs |
| unreachable anchor | **4 refusals `ANCHOR_FAILED`**, **0 rows** |
| opt-out control | **2 lifts, 2 per-entry anchors** |
| live notarizations | **5** |
| model calls | **0** |

Sequences: 810365, 810376, 810393, 810396, 810401.

The authorization gate is preserved: the anchor happens **before** the row exists. Batching changes
the cost of the gate, not its order.
