# E369 — limitations

- Constructed exact-length DNF worlds; the certificate is the E364/E306 best-of-5 greedy hitting set.
- Drift is a one-row out-of-class truth-table change; truth-preserving rewrites are not drift.
- The timing adversary chooses the injection round and row with the realised schedule in view.
- Latency is counted in verification rounds; wall-clock latency, money and query rate are unpriced.
- The two-level policy is a fixed 2:1 duty. An alarm-driven policy is equivalent in the adversary's
  view (it can wait for the slow phase); a policy whose slow phase is unavoidable is not tested.
- The dev-only selection is a bounded choice over four designed schedules at <=1.10x the nominal budget;
  it is not a compounding or general-intelligence claim.
- One host; 0 model calls; $0 API; 0 weights trained.
- The engine source is withheld under the IP rule; public verification is record-level and recomputes
  the per-round sizes, gaps, bounds, hypotheses and verdict, not the greedy certificate construction.
- v1 was a reporting-only run (D1); its salts are not revealed and its rows are not the sealed result.
- External reviewer NOT OBTAINED; no third-party audit; not general intelligence.
- AGI: NOT ESTABLISHED · RSI: EXPERIMENTAL.
