# E369 — next plan

1. **Alarm-driven schedules.** E369 models a fixed 2:1 duty. Test a schedule that responds to a real
   alarm (short cycle after detection, long cycle after a quiet period) under an adversary that knows
   the policy and can time the drift. The prediction is the same: the slow phase sets the bound.
2. **Two-row drift.** E354/E350 covered two-row and regional drift for a pre-placed change; repeat the
   cost frontier for a two-row injection (the adversary times the later row).
3. **Noisy verifier.** E340–E349 measured pooled audits under per-read noise; repeat the frontier with
   a flaky sweep, where a larger budget also buys more noise.
4. **Production wiring.** Put the flat cycle behind the production MCPGate boundary with single-use
   per-read permits (E343-G/E344-P/E345-R) and measure the tail latency of a real round.
5. **Recovery interaction.** Combine the flat cycle with E361-R recovery and E363-L leases; the cost
   frontier should include the recovery labels, not only the sweep.
