# E392-A — next plan

1. **Spread lies.** Distribute false claims across margins; measure the audit budget needed.
2. **Adaptive audit.** Stop when the remaining margin exceeds a threshold; measure cost.
3. **Noisy audit.** Audit with a flaky truth source (E340–E349).
4. **Compose with E383-M.** Persist the audit ledger and replay it after a restart.
5. **Live boundary.** Put the audit gate behind the production MCPGate interceptor.
