# PGL / E464-G Limitations

- Constructed 40-candidate world: 4 material (0.10), 3 transient (0.35 for four blocks then 0), 6 weak (0.03), 27 nulls.
- The colony is simulated; the gate uses the production cain.jit_capability issuer but not the full MCPGate network hop.
- The certificate issuer key is a study key; key custody and rotation are not solved here.
- Fresh audits use 1,024 trials; a transient can still pass by chance (about 0.07%).
- Two salts on one host; external reviewer NOT OBTAINED; not general RSI.

- The transient effect is designed; the study measures the gate, not the discovery of nonstationarity.
- The certificate issuer is a study key; the single-use permit is the production JIT issuer, not a network hop.
- A transient can still pass the 1,024-trial audit by chance (about 0.07%), and that residual is real.
- The auditor re-checks the enforcement rows and reasons; it does not re-run the wall-clock gate.

**AGI: NOT ESTABLISHED · RSI: EXPERIMENTAL**
