# Research Review

E72 reuses verified E69/E70/E71 sources (Agensh, VeriHarness, MINTEval/LongMINT, MAS-Orchestra; LAMaS withdrawn and
not adopted; etcd leases/CAS). New E72 decision: resource-aware admission and lease sizing are mandatory before
large-fleet claims; CPU oversubscription is a correctness/reliability failure, not a productivity result.
